The University of the District of Columbia (UDC) is creating the first ever campus plan for the Lamond-Riggs campus (formerly known as the Bertie Backus campus), the university’s community college campus located at 5171 South Dakota Avenue NE. UDC is planning the renovation and expansion of the campus. UDC anticipates doubling campus enrollment over 10 years, going from 1,500 students currently to 3.000 students by 2030.
UDC was required to submit a Campus Master Plan to the DC Zoning Commission. The Zoning Commission held a public hearing on October 30, 2023, and approved the plan at a public meeting on November 30, 2023. The Zoning Commission issued an Order effective April 12, 2024.
The 2023-2033 plan contemplates a two-phased campus development. Phase 1 will include renovation of the existing buildings on the campus. Phase 2 will include construction of a new wing on the campus.
In October 2023, UDC officials stated they were “evaluating proposals from Design-Build contractors for the development of Phase 1. Once a firm is selected and the contract is in place, the project is anticipated to take 16 months, including the design phase.” In September 2024, UDC officials stated, “A design-build firm has been selected. The firm is currently focusing on the programing phase for the redesign and modernization of the interior of the building. We expect this phase to take approximately 6 months. Once the design of the interior renovations has been completed, the design-build company will present a construction cost proposal that will require the UDC Board of Trustees approval prior to implementation.”
Phase 2 activities will occur during the second half of the plan (during years 5-10 of the plan). Funding is still needed for Phase 2 activities. UDC will have to provide notice and return to the Zoning Commission before beginning construction on the new wing.
- General fact sheet: UDC Lamond-Riggs Campus Plan Overview Fact Sheet
- Campus development fact sheet: UDC Lamond-Riggs Campus Development Plan Fact Sheet
- Presentation:
View the zoning documents on the Zoning Commission’s website, case no. 23-16.
- UDC Campus Plan (2023-2033) Zoning Order (April 2024)
- UDC Proposed Draft Order (November 2023)
- ANC 5A Response to UDC Post-hearing Statement (November 2023)
- UDC Post-hearing Statement (November 2023) (contains TDM)
- UDC Lamond-Riggs Campus Plan Hearing Presentation (October 2023) (contains renderings)
- ANC 5A Letter in Support (October 2023)
- Office of Planning Report (October 2023)
- DDOT Report (October 2023)
- Zoning Commission Hearing Notice
- UDC Proposed Lamond-Riggs Campus Plan 2023-2033 (June 2023)
- UDC Proposed Lamond-Riggs Campus Plan Supplemental Statement (October 2023)
- UDC Proposed Lamond-Riggs Campus Plan Comprehensive Traffic Review (CTR) (September 2023)
- Technical Attachments to CTR (September 2023)
- UDC Institutional Campus Master Plan
- UDC Capital Improvement Plan
- UDC Lamond-Riggs Campus Transportation Report (June 2023)
- UDC Lamond-Riggs Campus Master Plan Diagrams 1-12 (June 2023)
- UDC Lamond-Riggs Campus Master Plan Diagrams 13-18 (June 2023)
- UDC Lamond-Riggs Campus Master Plan Diagrams 19-24 (June 2023)
- UDC Lamond-Riggs Campus Master Plan Diagrams 25-36 (June 2023)
Phase 1 Campus Development Renderings


Phase 2 Campus Development Renderings