A required manhole is being installed over a three-week time on South Dakota Avenue outside the Food & Friends construction entrance. During this time, traffic will be one lane in each direction at this section of South Dakota Avenue from 9:30am to 3:30pm.
Dates for the planned work will be posted here as soon as we have them. All required signage, notice, and safety measures will be strictly adhered to.