September 21: Children’s Fall Festival Back to School Bash & Pizza Party

2024 Children’s Fall Festival Event Series
Hosted by DC Fray & the Cafritz Foundation
3rd Saturday, September-December
1:00 pm
The Modern at Art Place
400 Galloway Street NE

Below copied from DC Fray & the Cafritz Foundation

Link: https://www.eventbrite.com/e/cafritz-foundation-childrens-festival-event-series-tickets-993683322567

Join DC Fray + the Cafritz Foundation for our Children’s Festival Event Series for some free, community-centered fun every third Saturday from September to December! Please see the details below and select the date(s) that you plan to join us!

September 21st – Back to School Bash & Pizza Party

Enjoy some summer fun for the whole family! Join DC Fray + The Cafritz Foundation for lawn games, races, a mini golf course + prizes as part of our community-centered Children’s Festival Event Series.

October 19th – Field Day Fun

Share your nostalgic carnival favorites with the whole family this summer! Join DC Fray + The Cafritz Foundation to win fun prizes; play games like ring toss, cornhole, Plinko and pin the tail on the donkey; or get your face painted – all as part of our community-centered Children’s Festival Event Series.

November 16th – Carnival Experience

Ready to kick off this next school year? Join DC Fray + The Cafritz Foundation to collect free school supplies and warm up your brains with our immersive instructional experiences including fun math games + a visit from a reptile expert – all as part of our community-centered Children’s Festival Event Series.

December – Home for the Holidays

Calling all young witches and wizards! Show off your house pride by dressing up in your best robes and enjoy themed snacks, trivia, face painting, themed prizes + more. Join DC Fray + The Cafritz Foundation for free, all as part of our community-centered Children’s Festival Event Series.

September 19: DDOT Virtual Meeting on Phase-out of DC Circulator Service

From DDOT

The District Department of Transportation (DDOT) will host a public meeting to provide information on the phase-out of the DC Circulator service.  

For more information about this project please visit: dccirculator.com or contact Deborah Monts deborah.monts@dc.gov

WHAT: DC Circulator Phase – Out Public Meeting 

WHEN and WHERE: 

Thursday, September 19, 2024

Virtual Webinar

Join link: https://tinyurl.com/DCCirculatorMeeting

Webinar number: 2312 367 8110

Webinar password: jpJyUR4vd42 (57598748 when dialing from a phone or video system)

Join by phone

+1-202-860-2110 United States Toll (Washington D.C.)

1-650-479-3208 Call-in toll number (US/Canada)

Access code: 231 236 78110

TIME: 2:00pm – 3:00pm  

TO PARTICIPATE IN THE MEETING: Join the webinar through the link or phone numbers above.

September 21: Give your input on Vision Zero/Safe Streets

Share your thoughts about Vision Zero and safe streets.

The DC Offices of Vision Zero and Highway Safety are working to develop a new plan to reshape street safety efforts. Staff are holding listening sessions to work closely with communities and stakeholders to identify problems and build solutions. These discussions will be part of the top-to-bottom update of the District’s Vision Zero Plan and DC Strategic Highway Safety Plan. 

There will be in-person listening sessions across the city. View the full line-up

The Ward 5 listening session will be on September 21, 10:30am-11:30am at Lamond-Riggs Library.

Complete the online survey here by September 23, 2024, at noon. 

September 16: ANC 5A09 Community Meeting (Virtual)

From ANC Commissioner Shelagh Bocoum (5A09)

SMD 5A09 Meeting Agenda

Monday 09/16/2024 at 07:00 pm


Zoom Meeting
https://us02web.zoom.us/j/85380886626?pwd=aPcbXnRFn38Xai4DN22r9g8PHtfaff.1

Meeting ID: 853 8088 6626
Passcode: 590935

Agenda 

  • Aldi Alcohol License Request Update
  • Other topics of interest to the neighborhood

Please email Commissioner Bocoum at 5a09@anc.dc.gov if you have specific topics that you would like added to the agenda.

September 16-22: Ward 5 Week

Ward 5 Councilmember Zachary Parker is celebrating Ward 5 Day on September 22, 2024, at Turkey Thicket Recreation Center starting at noon. CM Parker’s office has a week of activities planned leading up to the big day.

Ward 5 Week pop-up events. 

  • Monday, September 16
    • 10:30 a.m. – Street Designation Ceremony for William Spaulding Way in the 1900 block of Randolph St NE
  • Tuesday, September 17
    • 4:00 – 5:00 p.m. – Rhode Island Ave Crawl at businesses in the 2000-2300 blocks of Rhode Island Ave NE
    • 5:00 – 7:00 p.m. – Drink Specials at His and Hers (2214 Rhode Island Ave NE)
  • Wednesday, September 18
    • 10:00 a.m. – Coffee with the Councilmember at Cool Coffee (3901 12th St NE)
  • Thursday, September 19
    • 5:00 p.m. – Ward 5 Bike Ride starting in Union Market area at 350 Morse St NE
    • 5:00 – 7:00 p.m. – Happy Hour at metrobar (640 Rhode Island Ave NE)
  • Friday, September 20
    • 12:00 – 6:00 p.m. – The Spice Suite at Black and Forth (2201 Channing St NE)
      • First 25 customers, buy one spice get one spice free with code “Ward 5 Day”
    • 5:00 – 7:00 p.m. – Happy Hour at DCity Smokehouse (203 Florida Ave NW)
  • Sunday, September 22

September 28: Art All Night Hosted by The Parks Main Street; Volunteer opportunities

From The Parks Main Street

The Parks Main Street (TPMS) is excited to host Art All Night 2024 presented by Mayor Muriel Bowser, Saturday, September 28, 5pm-10pm!

Once again, TPMS brings to the communities of Riggs Park and Manor Park this festival to end the summer with a bang!

This year the main performance stage is at The Modern at Art Place Plaza at the corner of South Dakota Ave NE & Galloway Street NE near the red rooster. Many of you attended the “Fridays at Fort Totten” music series there. Same Location!

For your free tickets, and to see current event locations, lineup, and activities, register on Eventbrite. Performances and times subject to change.

Interested in volunteering on the planning committee or for the day of the festival? Send an email to info@theparksmainstreet.org.

Interested in volunteering tomorrow morning? 

Help to put up yard signs to spread the word about Art All Night hosted by TPMS.

Come out between 10:00 am-12 noon tomorrow, September 7, to:

The Parks Main Street Office
210B Riggs Road NE, 2nd Floor right
Washington, DC 20011 
Call 202.423.1014

For your free tickets to Art All Night 2024, register on Eventbrite.

Aldi New Hiring Poster (September 2024)

New Hiring Poster (September 2024)

Aldi is now hiring for full-time and part-time positions at the new store that will be opening at 5300 South Dakota Avenue NE (at Kennedy Street NE) in fall 2024.

Aldi New Hiring Poster (South Dakota Avenue NE), September 2024

Individuals must apply online. Current opportunities posted on Aldi’s career site:

Full-Time Associate
Part-Time Store Cashier/Stocker
Full-Time Assistant Store Manager

Note, these are updated links and QR codes.

Applicants who are selected for an interview will likely be asked to interview at an existing Aldi location. Interview days are already being scheduled, so apply as soon as possible.

Aldi’s website offers the following tips for potential candidates: 

  • Do your research – Make sure you understand ALDI and the job requirements.
  • Arrive early – Try to arrive 10-15 minutes before your scheduled interview to allow yourself time to get settled.
  • Come prepared – Research common interview questions and brainstorm your answers. Prepare questions for your interviewer, to show you are interested in the position. Also, be sure to bring extra copies of your resume, and a pen and paper to take notes.
  • Follow Up – Kindly follow up with your interviewer(s) by sending a thank you email or handwritten note, thanking them for their time and expressing your interest in the position.

Please let your neighbors who are looking for part-time or full-time work know about these employment opportunities right here in the neighborhood and encourage them to apply.

The store is several weeks behind in construction due to delay in getting an interior buildout permit. They are still anticipating a fall opening around mid-November.

Limited Number of Free Nats tickets for September 12 for Ward 5 Residents – Register in advance

From Office of Ward 5 Councilmember Zachary Parker

The Washington Nationals are hosting Ward 5 neighbors at Nationals Park on Thursday, September 12 at 6:45 pm in their game against the Miami Marlins. They’ve given Ward 5 residents a limited number of free tickets. Join Councilmember Parker for a fun night of baseball and community! Request tickets at ward5.us/natspark2024.

September 4: North Michigan Park Civic Association Meeting

From North Michigan Park Civic Association

North Michigan Park Civic Association Monthly Meeting

Wednesday, September 4, 2024
7:00 pm to 9:00 pm

 VIRTUAL ONLY

Virtual Meeting

Meeting ID 882 7345 2110

Pass code 930240

Call In 1-301-715-8592

https://us02web.zoom.us/j/88273452110?pwd=dmZ3R1liOTRKY1FyS3hlYlBqWnBWUT09

Meeting Agenda 

·         Call to Order

·         Opening Prayer – Silent

·         Roll Call of Officers

Meeting Protocol

  • Meeting Protocol is Robert’s Rules of Order
  • Phone call should remain on mute unless asked to un mute. 
  • Respect others when speaking
  • Respect our guest.
  • Raise your hand if you have a question and wait to be acknowledged.

Community Update 

  • Community Information Expo (Oct)
  • Catholic Charities groundbreaking on Buchanan St NE 
  • Stormwater Project at NMP Recreation Center – will invite for update
  • South Dakota Ave Bike Lane  – Special meeting held August 7, 2024
    • Comment period ended August 15, 2024
    • Invite for Community Townhall with Director Kirshbaum of DDOT
    • Civic Association needs volunteers for a committee 
  • Successful bulk trash, e-cycle and document shred event July 27th
    • Filled 3 roll-offs, 2 e-cycle trucks and a truck overflowing with shred documents. Along with the number of cars and people walking up we also picked up bulk trash and e-cycle items from 35 senior residents in NMP
    • Thank the various department within DPW and the volunteers for their support
  • Fundraiser Committee – Nikitta Dixon, Aritha Willoughby
    • T-Shirt fundraiser

Guest Speakers:

  •  John Olver / Christine Shiker 
    • St. Anselm’s Abbey School Addition

Community Leader Reports

  • Mayor’s Office – MOCR –  new MPCR
  • Ward 5 Council Member’s Office –  Oliver Stoute 
  • ANC Commissioners 5A02, 5A03, 5A08, 5A09
  • President Queens Chapel Civic Assoc. – update regarding restaurant
  • Faith United Church – Rev. Joseph K. Williams, Sr. 

Community Concerns:

Open to residents

Adjourn

Red line stations are open

Metro reopened stations on the red line between Takoma and Glenmont on September 1.

Metro news release: https://wmata.com/about/news/Four-Red-Line-stations-reopen-Sept-1-MTA-Purple-Line-construction-continues-at-Silver-Spring.cfm

Thankfully, that means that the large number of charter buses idling on Galloway Street and along South Dakota Avenue, damaging neighborhood roads, and creating safety hazards in the neighborhood are now gone. Hopefully the next time Metro decides to shut down nearby stations, they will utilize their huge parking lot at Fort Totten station for shuttle buses instead of housing a bunch of buses in the neighborhood.

Social Justice School Relocation Update

Social Justice School Relocation Fact Sheet

Back in June, the DC Public Charter School Board approved Social Justice School’s relocation application (see this post for information about the relocation). The plan remains having modular classrooms in place at 333 Kennedy Street NE for the beginning of the 2024-2025 school year. If there is a delay, classes will be held temporarily at Impact DMV Church on First Place NE.

School officials are still negotiating with the Cafritz Foundation over a permanent move to the remaining warehouse at 3rd and Kennedy Street NE. If they reach an agreement, school officials anticipate that construction on the warehouse will take approximately 18 months and that they will be able to occupy the space in time for the 2026-2027 school year.

Aerial view of space reserved for Social Justice School temporary location in black border.

August 17: Back-to-School Events

There will be two back-to-school events in the neighborhood on August 17, 2024, one at Riggs-LaSalle Rec and one at Fort Totten Metro station.

Riggs-LaSalle Recreation Center Back-to-School Community Day
August 17, 2024
11:00 am-1:00 pm
Riggs-LaSalle Recreation Center (501 Riggs Road NE)

Free backpacks, school supplies, snacks & ice cream. Hosted by Friends of Riggs-LaSalle Recreation, Lamond-Riggs Citizens Association, and the Office of Ward 4 Councilmember Janeese Lewis George.

Metro Back-to-School Celebration & School Supply Giveaway
August 17, 2024
11:00 am-3:00 pm
Parking Lot at Fort Totten Station

Hosted by Metro Transit Police Community Services Bureau. Children of all ages are welcome from elementary to high school.

• Free School Supplies
• Kids Haircuts & Glam Station Makeovers
• DJ and Music
• Games and Fun
• Complimentary Food & Desserts
• Petting Zoo
• Miniature Train Rides 

Follow MTPD on twitter for up-to-date information.

August 22: Public Hearing on Food & Friends Curb Cut Request

Food & Friends is requesting a curb cut on South Dakota Avenue just north of Kennedy Street NE. The so-called conceptual curb cut request will be the subject of a DC Public Space Committee meeting on August 22, 2024 (application #445416).

Public Space Committee August 2024 Hearing Notice

Individuals may submit written testimony and send requests to testify by emailing public.spacecommittee@dc.gov by 9 am on August 20, 2024.

Food & Friends ANC 5A presentation (May 2024)
Food & Friends Curb Cut Project Fact Sheet (June 2024)

Food & Friends property lines, courtesy Food & Friends.

Food & Friends is looking to expand its building on the corner of South Dakota Avenue & Riggs Road NE in order to serve more clients. Because the land to the north of the property is District-owned land slated for park space, Food & Friends is looking to expand east towards South Dakota. Food & Friends reps have been to a few meetings, but there are still a lot of unanswered questions. They are calling this a conceptual curb cut project because they contend that their expansion is years away. So apparently the Public Space Committee is going to decide on whether the organization can get a curb cut on South Dakota Avenue in the absence of any information about their building expansion plan.

Conceptual curb cut diagram provided by Food & Friends.

Curb Cut Design

Residents do not have access to public space applications in the city’s online permitting system, which is known as TOPS. What we do know is that they are requesting a pretty sizeable curb cut (leading to a driveway) that looks to be about 33 feet wide on a block that currently has none. In an email to me, they said, “The design includes a 6-foot-wide pedestrian safety island, increased turn radii to alleviate off-tracking, and right-in/right-out movement.” We also know that curb cut access will likely require some amount of public space beyond just sidewalk access because of the way the property lines are drawn. But it is not clear to me based on the one diagram we have exactly how much public space they are requesting.

They say they are requesting this curb cut because they are thinking about building an expanded kitchen facility closer to South Dakota Avenue. So, they will want to reroute food delivery (via 18-wheeler trucks) to the South Dakota side in the future. My understanding is that DDOT is requesting that they close one of their two curb cuts on Riggs Road if they want a curb cut on South Dakota. My understanding is that staff and volunteers would continue to use Riggs to access the parking lot. But it’s a pretty large parking lot, so who knows if that space would be reconfigured as well as part of an expansion plan.

In an email to me, Food & Friends said:

Sixty-five staff, 80 kitchen volunteers, 10 Food & Friends delivery vans, 30 volunteer delivery cars and several vendor delivery trucks (including semi-sized) currently travel to our location daily to prepare and home-deliver 6,000 meals a day to the region’s most vulnerable neighbors.  We encourage use of Metro and cycling (we had a cycling team in the 2000s!) and routinely shuttle our staff and volunteers to the Metro station to encourage less vehicles.

Ward 5 Councilmember Zachary Parker submitted a letter in support of the conceptual curb cut to the Public Space Committee.

My thoughts

I do not think anyone has done a really good job of explaining what is really happening here and we’re being asked to comment on something on which we lack full information, specifically impacts to public space. Obviously, Food & Friends plans to build on their property and may even want more public space than what is being publicly discussed. Residents do not have access to applications in TOPS and the ANC is not doing anything regarding this matter. I’m sure most support Food & Friends in their goal to serve more clients around the region.

(Fun fact about me: I served in Americorps in DC before continuing my education. One team member was placed at Food & Friends, and we would have team service days at Food & Friends at their old location in Southeast DC. I’m a big fan and supporter of Food & Friends).

We already know that curb cuts introduce vehicle/pedestrian conflicts. I think a really useful conversation would be how to maximize the amount of public space available to the community, how to minimize harm introduced by installing a new curb cut on the block, and how to safely and most efficiently accommodate the multiple uses that the property owners in the immediate area wish to put in that one little area.

I think it would be super useful for the property owners in the area to talk to one another, particularly the Cafritz Foundation (and their tenants) and Food & Friends. This conversation could also include Metro, National Park Service, and Impact DMV Church. I get the impression they don’t really communicate about their plans and how they are connected to an actual neighborhood, and I think that lack of communication at an institutional level makes it way more difficult than it needs to be to get things done.

Anyways, submit comments to the Public Space Committee at public.spacecommittee@dc.gov by August 20 and send a copy of your comments to CM Parker.

Due Today August 15: Comments on DDOT South Dakota Avenue Corridor Safety Project

[Ed. Note: Republishing this post because today, August 15, is the last day to submit comments for the first phase of engagement on the South Dakota Avenue Corridor Safety Project. There is still time to provide feedback to DDOT to make sure we address speeding through street design, get needed improvements at key intersections in the neighborhood, and work towards developing a corridor that safely supports multiple means of moving around the neighborhood outside of just private vehicles.]

DDOT is looking at ways to address safety issues on South Dakota Avenue from Bladensburg Road NE to Riggs Road NE.

Let DDOT know what you think about what is needed along the corridor by completing this questionnaire and providing information on this public input map (where you can identify important changes you’d like to see at specific intersections like more visible crosswalks, better pedestrian accommodations, etc).

Councilmember Parker earmarked funds in the FY2024 budget for a road diet on the corridor. While much of the media attention has been erroneously focused on bike lanes, the alternatives for a road diet include potential parking lanes where there are none currently, as well. It is worth taking a look at the presentation slides to see all of the alternatives, including how DDOT could potentially address traffic diversion to side streets or address congestion through, for example, signal timing.

Most agree speeding is a problem on South Dakota. There is a relatively low volume of vehicles during off-peak hours, which makes the wide road ripe for speeding. There are too many crashes and near misses. People feel unsafe crossing the street. Too many pedestrians have been injured or killed walking along the corridor. People want to be able to safely walk and bike to points along the corridor. Everyone wants the situation to be addressed. The question is how to get there.

Project Scope

DDOT is going to study the entire corridor, examine three concepts for a road diet, select one concept, and design and build the concept on one portion of the corridor. DDOT will also make spot improvements at certain intersections, which is why it is really important to indicate on the map where improvements are needed. DDOT plans to start construction on the southern end (near Bladensburg) because they state that is where there is highest need.

DDOT is going to study three options for the corridor.

Option One: 3 lanes with full-time parking

Option one would have three lanes with parking on each side of the street.

  • Maintains one lane in each direction
  • Uses curbside space for full-time parking
  • Center space can be left turn lanes or pedestrian islands depending on needs

(Currently, no parking is allowed on South Dakota except for limited parking on the west side of South Dakota between Galloway and Ingraham (soon extending to Kennedy). A couple of churches closer to the southern end of the corridor use a lane for parking on Sundays.)

Option Two: 3 lanes with parking and two-way protected bike lanes

Option two would have three lanes with parking and a two-way protected bike lane:

  • Maintains one travel lane in each direction
  • Uses curbside on one curb face for protected bike lanes
  • Uses opposite curb for parking
  • Center space can be left turn lanes or pedestrian islands depending on need

Option Three: 3 lanes with protected bike lanes in each direction

Option three would have three lanes with protected bike lanes in each direction.

  • Maintains one lane in each direction
  • Uses curbside space for protected bike lanes
  • Center space can be left turn lanes or pedestrian islands depending on needs

Project Timeline

DDOT plans to gather data, explore concepts, and gather input before holding a second round of public meetings in fall 2024, having a third round of public meetings in winter 2024/2025, beginning work on design plans in spring 2025, and finally starting construction just on the southern end in summer 2025.

Though DDOT is going to focus the limited construction money on the southern end of the corridor to start, please take the time to provide input to DDOT about neighborhood issues through this public engagement effort. In particular, I think that highlighting problematic intersections and needed safety, mobility, and access improvements in the neighborhood on the public map will be useful given that we know there are no immediate plans for bike lanes on SDA in the neighborhood.

Contacts

Questions may be sent to the project team:

Sayra Molina, Corridor Safety Team
sayra.molina2@dc.gov

Christine Mayeur, Associate Director, Traffic Safety Engineering
christine.mayeur@dc.gov

Dalando Baker, Ward 5 Community Engagement Specialist
dalando.baker@dc.gov

August 12-16: Metro Lift and Senior SmarTrip Discount Fare Card Registration at Lamond-Riggs Library

h/t Neighbor Robert

Metro and DC Public Library are partnering to offer Metro Lift and Senior SmarTrip card registration at select library locations. Eligible residents save 50% on bus and rail fares.

Representatives will be at Lamond-Riggs Library August 12-16.
5401 South Dakota Avenue NE
Monday – Wednesday 9:30 a.m. – 5:30 p.m.
Thursday 12:30 p.m. – 5:30 p.m.
Friday 10:30 a.m. – 5:30 p.m.

Bring current government-issued ID with proof of age, phone number, SNAP electronic benefits transfer card, and SNAP benefits summary (household).

Please let your neighbors know.

Riggs Road & South Dakota Avenue Park Update

The DC Department of Parks & Recreation (DPR) gave an update on plans for a neighborhood park on the southwest corner of South Dakota Avenue and Riggs Road NE.

DPR Ward 5 Capital Project Update Presentation (August 2024)

I am going to call this more of a neighborhood green space because calling it a park evokes visions of a playground and vast amenities, which is not at all what is happening here. There is only $400,000 allocated for design and construction of this green space so it will be more like signage, landscaping, benches, that kind of thing (unless more funding comes).

The project website is https://dgs.dc.gov/page/riggs-south-dakota-park-0. I would say to ignore the design start date on the presentation slide shown above because it does not make sense and conflicts with what is on the project website:

Riggs & South Dakota Park

Project Details:

Address: Riggs Road & South Dakota, NE
Ward: 5
DPR Project Manager: Nick Kushner
DGS Project Manager: TBD
Project Status: Scope of Work Development
Design Start Date: Summer 2024
Design End Date: TBD
Project Delivery: Design-Build
Architect: TBD
General Contractor: TBD
Current Budget: $400k
Construction Start Date: TBD
Construction End Date: TBD
DGS Contact: Chellese Grove

I reached out to DPR to get a better understanding of the process for this green space. Here is what DPR stated.

There are two key phases in the design process:

1. Initial Community Input: Later this summer, DPR’s Community Planning team, led by Nick Kushner, will host a “Walk and Talk” in the park. This session will gather initial input from stakeholders . . . to help inform the design.

2. Design Kickoff: The actual design work begins once [DPR] hires a design team. This is anticipated to start in summer 2025, contingent on [DPR’s] collaboration with DDOT to either transfer the property or obtain the necessary permits. After the design team is on board, [DPR will] hold further meetings with the community to refine the concepts.  [DPR] do[es]n’t yet have a timeline for the DDOT coordination. 

    DPR also shared with me an overall project timeline that they made sure to say is tentative and subject to change based on permitting, weather, etc.

    • Late Summer 2024: DPR “Walk and Talk” – Stakeholder feedback session.
    • Late Summer 2025: Design process begins after the Landscape Architect is hired and DDOT approvals are in place.  Please note that this could possibly start sooner, but we like to err on the side of caution when it comes to projected timelines.
    • Fall/Winter 2025: Community meeting to refine the design.
    • Spring/Summer 2026: Construction begins.

    We have been writing about this space for a while now and the advocacy behind activating this green space. The tricky thing is that the space sits in DDOT’s portfolio given that it consists of the old right-of-way. DDOT does not want to give it up, for reasons. (Residents can see that it is currently serving as a construction staging area for the Riggs Crossing Senior Residences development project). DDOT has repeatedly stated (to me at least) that DPR will need to program the space through the public space permitting process, whereas DPR previously understood that the space would be transferred into DPR’s portfolio. I am hoping that we will not stay on this merry-go-round of dealing with the same question and that the right hand and left hand will really start working together. That will take leadership.

    Also complicating things a bit are expansion plans by Food & Friends and their curb cut project. More on that to come.

    DDOT South Dakota Avenue Corridor Safety Project – Give Input by August 15, 2024

    DDOT is looking at ways to address safety issues on South Dakota Avenue from Bladensburg Road NE to Riggs Road NE.

    Let DDOT know what you think about what is needed along the corridor by completing this questionnaire and providing information on this public input map (where you can identify important changes you’d like to see at specific intersections like more visible crosswalks, better pedestrian accommodations, etc). Give your input by August 15, 2024.

    Councilmember Parker earmarked funds in the FY2024 budget for a road diet on the corridor. While much of the media attention has been erroneously focused on bike lanes, the alternatives for a road diet include potential parking lanes where there are none currently, as well. It is worth taking a look at the presentation slides to see all of the alternatives, including how DDOT could potentially address traffic diversion to side streets.

    Most agree speeding is a problem on South Dakota. There is a relatively low volume of vehicles during off-peak hours, which makes the wide road ripe for speeding. There are too many crashes and near misses. People feel unsafe crossing the street. Too many pedestrians have been injured or killed walking along the corridor. People want to be able to safely walk and bike to points along the corridor. Everyone wants the situation to be addressed. The question is how to get there.

    Project Scope

    DDOT is going to study the entire corridor, examine three concepts for a road diet, select one concept, and design and build the concept on one portion of the corridor. DDOT will also make spot improvements at certain intersections, which is why it is really important to indicate on the map where improvements are needed. DDOT plans to start construction on the southern end (near Bladensburg) because they state that is where there is highest need.

    DDOT is going to study three options for the corridor.

    Option One: 3 lanes with full-time parking

    Option one would have three lanes with parking on each side of the street.

    • Maintains one lane in each direction
    • Uses curbside space for full-time parking
    • Center space can be left turn lanes or pedestrian islands depending on needs

    (Currently, no parking is allowed on South Dakota except for limited parking on the west side of South Dakota between Galloway and Ingraham (soon extending to Kennedy). A couple of churches closer to the southern end of the corridor use a lane for parking on Sundays.)

    Option Two: 3 lanes with parking and two-way protected bike lanes

    Option two would have three lanes with parking and a two-way protected bike lane:

    • Maintains one travel lane in each direction
    • Uses curbside on one curb face for protected bike lanes
    • Uses opposite curb for parking
    • Center space can be left turn lanes or pedestrian islands depending on need

    Option Three: 3 lanes with protected bike lanes in each direction

    Option three would have three lanes with protected bike lanes in each direction.

    • Maintains one lane in each direction
    • Uses curbside space for protected bike lanes
    • Center space can be left turn lanes or pedestrian islands depending on needs

    Project Timeline

    DDOT plans to gather data, explore concepts, and gather input before holding a second round of public meetings in fall 2024, having a third round of public meetings in winter 2024/2025, beginning work on design plans in spring 2025, and finally starting construction just on the southern end in summer 2025.

    Though DDOT is going to focus the limited construction money on the southern end of the corridor, please take the time to provide input to DDOT about neighborhood issues through this public engagement effort. In particular, I think that highlighting problematic intersections and needed safety, mobility, and access improvements in the neighborhood on the public map will be useful given that we know there are no immediate plans for bike lanes on SDA in the neighborhood.

    Contacts

    Questions may be sent to the project team:

    Sayra Molina, Corridor Safety Team
    sayra.molina2@dc.gov

    Christine Mayeur, Associate Director, Traffic Safety Engineering
    christine.mayeur@dc.gov

    Dalando Baker, Ward 5 Community Engagement Specialist
    dalando.baker@dc.gov