

ANC Commissioner Danielle Geong (4B09) passed along a letter from DDOT that residents should have received regarding sidewalk work expected to start on March 9, 2026, on Nicholson Street NE from 8th Street to Kennedy Street.
Resident Notification Letter – Nicholson Street NE 8th to Kennedy.
The repairs will include sidewalks, curbs, gutters, and/or wheelchair ramps at Nicholson St NE from 8th St to Kennedy St. The contractor is authorized to work Monday through Saturday, from 7:00 a.m. to 7:00 p.m.
Note that the work may require residents to remove their vehicles from the street so please pay attention to posted signs.
Questions may be directed to Victor Nwabueze at (202) 369-9851 or victor.nwabueze@dc.gov.