Neighbor Gavin passed along some trail and bike lane updates from the DC Bicycle Advisory Council. Learn more about active bike projects on DDOT’s Bike Lane Projects page.
- Met Branch Trail Fort Totten – Takoma Segment: Construction expected to wrap this Fall.
- Met Branch Trail Blair Road to Piney Branch Road Segment: Construction to begin in 2026.
- Michigan Avenue Trail (between Harewood Road and Monroe Street): At 65% design – expect NOI to be published in September.
- Galloway Street Trail: Eastern Federal Lands is finalizing 100% design and hopes to begin construction soon. Anticipated construction 2026/2027.
- Kansas Avenue: Includes protected bike lanes between Blair Road NW and Chillum Place NE. The existing bike lanes between Longfellow and Blair Road will be upgraded to protected. Construction to begin in late September/early October.