Late post

Thanks to resident Gavin Baker for passing along information from ANC 4B’s meeting on November 28, 2022. At the meeting, the District Department of Transportation (DDOT) presented on plans for the Blair Road to Piney Branch Road segment of the Metropolitan Branch Trail (MBT).
Included in the presentation is a slide regarding the Fort Totten to Takoma extension of the MBT. Following a bid process, DDOT anticipates a pre-construction meeting in February 2023 and a notice to proceed in March 2023. DDOT previously anticipated that construction on this segment would start in summer/fall 2022.
Information regarding the MBT is available at https://metbranchtrail.com.