From DDOT


DDOT Eastern Avenue NE Rehabilitation Project Virtual Meeting Flyer
The District Department of Transportation (DDOT) invites you to a virtual public meeting on Wednesday, June 22, 2022, for a presentation on the Rehabilitation of Eastern Avenue NE (from New Hampshire Avenue NE to Whittier Street NW) project. DDOT will share an update on the project and discuss the upcoming steps at this virtual public meeting.
Project website: https://ddot.dc.gov/page/rehabilitation-eastern-avenue.
DATE: Wednesday, June 22, 2022
TIME: 6:30 pm – 8:00 pm
VIRTUAL MEETING: WEBEX
To view the virtual presentation: rebrand.ly/EasternAveJune22
Event Number: 2313 398 4282
Event Password: June22!
Dial-in option (audio only): 1-202-860-2110 Access code: 2313 398 4282
The Webex system will prompt you for a Numeric Webinar Password: 5863220
Press the # key to join the meeting.
Having difficulties joining the meeting?
If you need technical support during the meeting, please dial 202-309-3491.
Project Background
Eastern Avenue is a boundary street between Washington DC and the state of Maryland. The District Department of Transportation (DDOT), in support of DDOT’s moveDC plan and Mayor Bowser’s Vision Zero Initiative, is working to create a safer, more livable, sustainable and attractive corridor. This project is in the design; this June 2022 meeting will be the last public meeting before the final design is completed.
Project Overview
The project objective is to increase multi-modal (pedestrian, bicyclist and motorist) safety and to improve the corridor’s appearance and functionality with new pavement and granite curbs; new sidewalks; addition of bicycle lanes; improved lighting; improved drainage; and new landscaping, while reducing vehicular speeds with curb extensions, signal upgrades and pavement markings.
Key Improvements
DDOT has integrated the following key elements into this project since the public meetings based on community feedback:
• Signal modifications and Americans with Disabilities Act (ADA) improvements at the intersection of Eastern Avenue NE and New Hampshire Avenue NE
• Signal modifications and ADA improvements at the intersection of Eastern Avenue NE and Kansas Avenue NE
• New traffic signal and intersection reconfiguration at Eastern Avenue NE and Sligo Mill Road NE
• Full depth roadway pavement reconstruction for the entire length of the project
• Street lighting upgrade for the entire length of the project
• Granite curbs for the entire length of the project
• New inlets and replace and upsize damaged existing inlets
• New sidewalks and replace damaged existing sidewalks
Project Timeline
- Public Meeting #1
- December 2016
- Public Meeting #2
- September 2017
- Public Meeting #3
- June 2022
- Design Completion
- July 2022
- Anticipated Construction
- 2026
Project Contact
Stacee Hemby, Community Outreach